Sunday, November 4, 2007

Summary Of Chapters In Wish You Well

PARK PROJECT CONDOMINIUM INSURANCE

published a draft of the park which was mentioned in yesterday's meeting, as was the case, can be a useful basis to implement and arricchire.Alla light of the findings yesterday, the hypothesis to green alfalfa in the area facing rail, should have been shelved ...

PROJECT PROPOSAL FOR PARK RESIDENCE Nunziatella

Presented by: M. Biondi, V. Hill, C. Rossetti
With the technical assistance: Agriservice Veronesi

Classification Project:

The project is the construction of works (irrigation system, and arrangement of the completion of planting) and maintenance of the park.

Irrigation:

will be produced in separate sectors, and controlled with a remote control valves. The number of sectors that will be realized will depend on the flow characteristics of the well and it is conceivable that it can vary from 4 to 6 sectors. Irrigation will be accomplished by spraying with long-range (like guns).
Should it be necessary to some areas will be irrigated with sub-irrigation systems, which have a manufacturing cost of a 10-15% more, but allow a considerable saving of water. Irrigation will cover the living quarters, while the part between the road and the railway will be irrigated with recoil hose,
for which only needed a power nozzle to be positioned across the road.
In order to avoid any problems with the current irrigation of gardens for private use, the irrigation of the park will be completely independent from the existing one.

Completion of planting and reconstruct the

Completion of planting:
There are some areas near the homes side Aurelia, that without planting will be completed. Our project plans to complete the planting of these areas with trees.
At the park ranging from houses to the street side Capalbio the completion of the planting will be performed by the addition of 150 trees and 250 shrubs arbutus, mastic, myrtle. Much of the latter will be used for the definition of the service passages and paths for walks in the park will be built (The proposed meeting will be summarized with the plans).
The portion between the road and the railway will not be replanting trees, but will be managed by the maintenance of the park with essences that are capable of maintaining AutoPage, an example may be alfalfa, but the assumption he can do other, Let's see in detail: The hypothesis
 alfalfa + is simple and the one with the best ratio performance / size / appearance, because a field of alfalfa requires little water (1 time per month) of 3-4 cuts per year and always maintains a calm and bright bluish green color with an intense aroma, especially in bloom. In the other hand has the problem that is high enough, especially before cutting, and can not walk on it.
 Another hypothesis may be a mixture of forage low height, such as clover, trefoil, sainfoin. Again the issue is very nice, there are different flower colors (yellow, pink, red, pink), but the efficiency is much lower (if any) and needs more watering (2 times a month) to check the availability of well water.
 A third hypothesis is that of a spontaneous grass (like what's already there), if anything, enhanced with a rhizomatous grass overseeding of the type "Potentilla" (a plant that resembles in appearance to the wild), clover repens (creeping ) and alfalfa. In this case it is certain that the waiving of performance and therefore the maintenance will cost, is also a need for greater amounts of water. In
However it is for the operator to provide cutting (at least 2-4 times a year) and 'use of the derivative. Access will be maintained of the steps and walking trails.
the embankment supporting the road sea side will undertake sowing of legumes (alfalfa, sulla, sainfoin), which require little water and give the lawn a variety of colors ranging from yellow to red and violet. The same type of seed will be partly used for the herbal essences of the park.
Intrusion Barrier: On the border between the area of \u200b\u200bproperty and services begins where the hedge of a broom will be carried out with anti-intrusion barrier of prickly pear plants.
repositioning of thuja hobbit: the park there are an excess of these plants and, moreover, located in dense bush. In particular, among the houses in the el'Aurelia there is a clump of several plants. These will be relocated in replacement / completion of planting the perimeter starting from the service area. This avoids placing them appropriately on the sea will remain free. The thuja that will be used for replacing plants that die perimeter.
In bed of the road that separates the two carriageways of the wood which is put rosemary (favoring the strip), myrtle, broom, mock privet and other plants typical of the southern Maremma, for a total of 300 species.
The irrigation of the flower triangle at the entrance of the living area will be automated by means of solenoid valves with remote control.

park maintenance

will need those making the above operators also provide maintenance for the next four years as a guarantee.
maintenance of the park must provide: 
Pruning, fertilizing and watering plants.
 Irrigation and mowing grass species to No. 6 cuts a year
 Treatment mosquito distributed across the year (irrigation will result in a significant increase of insects)
 Clean the road in the population with N ° 2 times a year
Before starting with the construction of irrigation and replanting will be necessary to make a leveling of the land to its better machinability.

Financial Plan

E 'for several years now that we are investing resources in this residence without significant results, neither aesthetic nor functional economies and even less management. The philosophy of this project is to distribute over three years to get the achievements that for each year the sum of the costs of operations and maintenance and repair does not exceed more than what they already spend on the maintenance of the park alone, or with no additions cost than at present. At the end of three years you will have a significantly reduced because maintenance will remain the one voice.
 First year:
Design irrigation system maintenance
+ + partial replanting  Second year: Completion
replanting + maintenance
 Third year:
Completion of the park with any service + maintenance
 Fourth year:

Maintenance for details of costs and estimates, see Annex to be presented verbally at the meeting.


landscaping Natural-History-Intervention

The "Spirit of Place" which is developed in this project is a playful spirit with a respect for the environment (native plants) agreed and completed with an irrigation system that will respect the fact that water is a precious resource. Allegro, because the herbal essences that we will use are not only green but are colored flowers that give a visual effect is particularly marked and that changes in tone. The essences of trees that are included are typical of the area, to avoid the choking effect has chosen not to use the time to mature trees favoring the combination of various green plants of the Mediterranean.
The last point, that of respect for natural resources (water first) is an essential point that has tied all the choices from that to irrigate only a portion of the park with a dedicated facility. But we could not be in tune with all the natural and architectural trends that now pose this as a "must" for all achievements.

The costs: For the irrigation system € .14.000
to pave the ground where you need a little E.500
For 250 trees E. 1500
For 300 Mediterranean plants
E.1800 E.2200 For planting
management of the park would cost E.10.000 year except mosquito treatment

0 comments:

Post a Comment